Current Highlights

Lorem ipsum dolor sit amet

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer pharetra elit at...
Read More
Learn more
Read More

Infrastructure System – Pneumatic Conveying Systems | Pipe & Belt Conveyor Systems | Railway Wagon Loading & Unloading System

India’s Central Electricity Authority (CEA) has worked out an implementation plan by December 2022 based on discussions with individual power plants to install FGD systems and bring these plants in compliance with the latest Government emission standards. According to an investment banker report, there is an opportunity for FGD systems of INR 1.3 trillion, based upon the 196 GW from the retrofit of existing power plants and 165 GW from the new plants, that have agreed to this implementation timeline with the CEA by December 2022. Ducon is a leading supplier of all types of FGD systems and has its own technologies for these types of FGD systems: limestone, seawater, and Dry Sorbent Injection. Company has many successfully operating FGD installations in India, the notable ones include: (i) 500 MW seawater FGD systems at Dahanu power plant and (ii) 2×600 MW Limestone FGD system at Udupi Power Plant.Hence Ducon is well positioned in this market due to its eminent position.

Ducon also has technologies for providing complete bulk material handling system for Alumina, fly ash, and other materials for silo loading & unloading, rail-car loading & unloading, long distance pipe conveyor systems and air slide & airlift systems. Company has numerous successfully operating installations at : NALCO, BALCO, Hindalco & Vedanta group.

Ducon Infratechnologies Ltd. is a medium size EPC company in the field of Air Pollution Control (Flue Gas Desulphurization (FGD) Systems, Wet Scrubbers, Bag Filters, Cyclones . Material Handling Systems (Belt Conveyor Systems, Pipe Conveyor Systems, Pipe Conveyor Belt, Pneumatic Conveying System, Mechanical Conveyor, Mechanical Conveyor Belt, Powder Handling System, Alumina Handling Systems, Dry Bulk Material Handling, Air Slides, Silo Systems), Rural Electrification, Software Services.

The Government of India, with promise of 24 X 7 Electricity to all, is providing Transmission & Distribution through Government funding to the State Electricity Boards of up to INR 43,000 Crores for such electrification projects, requiring power transmission & distribution systems and services. Ducon with its vast previous experience is actively executing many such projects all across India.

 
Sea-water FGD
Sea-water FGD
Alumina & Material Handling System
Alumina & Material Handling System
Wet Limestone FGD
Wet Limestone FGD
Electrification Projects
Electrification Projects
FGD in A Lead Smelter
FGD in A Lead Smelter
Video Security & Surveillance
Video Security & Surveillance